KEY PROJECTS EXECUTED

Client : China Road and Bridge Corporation/ Kenya Railways   The Standard Gauge Railway Project (SGR – Mombasa to Nairobi)

Project – lead- Technical – operations Director: The –Construction of Groundwater supply facilities at the construction camp of Syokimau and Makindu camps. The drilling and equipping of Bulk water supply boreholes for the construction camps and the SGR construction program.

Project Value                                                              446, 927US Dollars.

 Client : Zahkem Group/ Kenya Pipeline

The Constuction of a Bulk Petroleum Pipeline from Mombasa to Nairobi

Project – lead- Technical – operations Director: The –Construction of Groundwater supply facilities at the construction camps along the pipeline. The drilling and equipping of Bulk water supply boreholes for the construction program.

Project Value * None Confirmed Estimate     566,120 US Dollars.

 Client ATHI WATER SERVICES BOARD/ WORLD BANK

Project – lead- Technical – operations Director: The – World Bank Project in Kiambu: The drilling and equipping of Bulk water supply boreholes in the Kiambu County under the World Bank funding at the Project Value:                                                             1,573,033 US Dollars.

 Client ATHI WATER SERVICES BOARD/ AFD BANK

Nairobi Informal Settlements Water and Sanitation Improvement Project.. (NISWASSIP) .. Construction of Independent Water Supply Points and Sanitation Projects

Project – lead- Technical – operations Director: The drilling and equipping of Bulk water supply boreholes in the Nairobi informal settlements of Nairobi, Kariobangi . Mathare; Lunga Lunga; Kariobangi and Kibera.

Project value through AFD Funding                        1,777,777.00 US Dollars

 Client: STATE HOUSE NAIROBI:

Project – lead- Technical – operations Director: The –State House Nairobi, The drilling and equipping of Bulk water supply boreholes for state House Nairobi.

Project Value                                                                           244,000 US Dollars.

 Client : Sinohydro Corporation : Outer Ring Road Dual Carriageway Segment  

Project – lead- Technical – operations Director: The –Construction of Groundwater supply facilities at the construction camp at the East African School of Aviation Embakasi. The drilling and equipping of Bulk water supply boreholes for the construction program.

Project Value:                                                             46,500 US Dollars.

 Client : China Wu Yi Kenya Limited : The Mbagathi Way Dual Carriageway Segment  

Project – lead- Technical – operations Director: The –Construction of Groundwater supply facilities at the construction camp at Bomas of Kenya, Mbagathi. The drilling and equipping of Bulk water supply boreholes for the construction program.

Project Value                                                               46,250 US Dollars.

 Client: EAST AFRICAN BREWERIES:

Project – lead- Technical – operations Director: The –Rehabilitation of the Bulk Water Supply Project at the Brewery Facility Nairobi.

Project value:                                                                 66,670 US Dollars.

 Client: CARE KENYA

Project Consultant: The drilling and Rehabilitation of Water supply Boreholes at the Daadab refugee Camp. Under the Care Kenya / Drilling Spares and Services Contract.

Project value:                                                             44,000 US Dollars.

 Client: Brookside Dairy Limited – Ruiru

Project – lead- Technical – operations Director: The –Construction of Bulk Groundwater supply facilities at the Brookside Dairy complex.. Ruiru for the Liquid and milk Powder plant for the Daily Factory. The drilling and equipping of Bulk water supply boreholes for the Current factory and the expanded facility.

Project Value:                                                    266,334.00 US Dollars.

 Client : Sinohydro Corporation : Thika Road Dual Carriageway Segment  

Project – lead- Technical – operations Director: The –Construction of Groundwater supply facilities at the construction camp in Kasarani and Crusher pit in Kilimambogo. The drilling and equipping of Bulk water supply boreholes for the construction program.

Project Value:                                                                      77,000 US Dollars.

 Client: Timaflor Limited– Timau 2006 – Todate

Project – lead- Technical – operations Director: The –Construction of Bulk Groundwater supply for the 1000 Hactares – floricultural farmland in the Upper Timau area Buuri Sub – County; Meru County. The drilling and equipping of 10 Bulk water supply boreholes, with a rated capacity of 40 – 100m3/hr for the flower production processes.

Close to US Dollars:                                               700,334.00 US Dollars.

Client: Lolomarik Flowers / Lolomarik Farm Limited– Timau 2001 – To date

Project – lead- Technical – operations Director: The –Construction of Bulk Groundwater supply for the 10,000 Acres farm – partly livestock support and – floricultural support farmland in the Upper Timau area Buuri Sub – County; Meru County. The drilling and equipping of 12 Bulk water supply boreholes with a capacity of 40 – 100m3/hr for the flower production processes and livestock support activities.

Close to 12no boreholes have been constructed at the estimate cost US Dollars:   840,204.00 US Dollars.

 Client: Everest Enterprises Limited – Timau and Nyeri Farm Lands 2006 – 2008

Project – lead- Technical – operations Director: The –Construction of Bulk Groundwater supply for the 200 Acres – floricultural farmland in the Nanyuki area; Laikipia and Nyeri District. The drilling and equipping of 6 Bulk water supply boreholes with a capacity of 80 – 100m3/hr for Horticultural support and production processes.

Close to US Dollars:                                        244,124.00 US Dollars.

 Client: Colour Crops Limited– Nanyuki 2004 – To-date

Project – lead- Technical – operations Director: The –Construction of Bulk Groundwater supply for the 200 acres – floricultural farmland in the Nanyuki area; Laikipia County. The drilling and equipping of 3 Bulk water supply boreholes with a capacity of 40 – 120m3/hr for the flower production processes.

Project Cost:                                                                      155, 555.00 US Dollars

 VEGPRO KENYA LIMITED – Nanyuki Farm Lands  2006 – 2010

Project – lead- Technical – operations Director: The –Construction of Bulk Groundwater supply for the 100 Acres – floricultural farmland in the Nanyuki area; Laikipia County. The drilling and equipping of 6 Bulk water supply boreholes with a capacity of 30.0 – 40m3/hr for the Floricultural and Horticultural support and production processes.

Project Cost:                                                                       223, 104. US Dollars

 Client: AAA GROWERS Limited – Timau and Nyeri Farm Lands

2006 to Date

Project – lead- Technical – operations Director: The –Construction of Bulk Groundwater supply for the 200 Hectares – floricultural farmland in the Naromoru Nyeri County farmlands and the Timau Meru County localities. The drilling and equipping of 7 Bulk water supply boreholes with a capacity of 40 – 70m3/hr for Horticultural support and production processes.

Project Cost:                                                                       284, 342.00 US Dollars

Client: Kenya Wildlife Service. Meru Conservation Area.  

Project – lead- Technical – operations Director: The –Construction of Groundwater supply facilities at the Meru Conservation area; inclusive treatment plants – (Denoted MCA Water Supply Facilities). The drilling and equipping of Bulk water supply boreholes; inclusive treatment works- for the wildlife conservancy outposts and Main office Complex.

Project value:                                                                180,000 US Dollars.

 Client : Lewa Wildlife Conservancy  

Project – lead- Technical – operations Director: The –Construction of Groundwater supply facilities at Lewa Wildlife Conservancy of Isiolo covering the 63,000 acres. The drilling and equipping of Bulk water supply boreholes for the outpost community support systems and the Resort facilities.

Project Value:                                                                                76,425US Dollars.

 Client : Sera Wildlife Conservancy Samburu  

Project – lead- Technical – operations Director: The – Construction of Groundwater supply facilities at the 100,000 acres wildlife Conservancy in the Samburu region; North Isiolo County. The drilling and equipping of Bulk water supply boreholes for community and wildlife conservation control points.

Project value:                                                                   10,630 US Dollars.

 Client: North Timau Irrigation Farmlands

Project – lead consultant- The – 62000 US Dollars – systematic Sustainability Assessments for the North Timau Well filed in collaboration with GEO-Measure Pty South Africa.

Quietly Leading the water industry for the last 20 Years